The Cool House has been our home for seventeen years now, that’s hard to believe as we’d lived in many houses in various countries on two continents before I spotted it on the MLSLI website back in 2003. I fell instantly, head over heels in love from that moment. I swear the hairs on the back of my neck stood up and tingles ran down my spine. My love for it has only deepened over the years, for its unique architecture and the warm, inviting design of the original Andrew Geller plans, through all the renovations–really gentle updates–we did over the years to bring it up to today’s codes.
Saturday, April 24, 2021
The Cool House–Final Chapter
Saturday, January 30, 2021
Whatcha been up to?
Well Instagram ruined blogging for me. Why spend 30 minutes coding, writing and updating a blog when you can post a pic in two seconds and it lasts FOR EVER? But this blog is an aide-memoir and a history of this uniquely modern Andrew Geller designed house and so occasionally, say every six or seven years, I’ll pop in to add an update.
This year has been challenging, COVID-19 has meant no trips, no visits to museums or art galleries and no eating out. I’ve rediscovered a love of cooking and in the past 10 months we’ve only had takeout a handful of times. If you had told me a year ago I wouldn’t set foot in a restaurant for the foreseeable future I would have thrown myself kicking and howling to the floor, but it has been more fun than I could have imagined.
Maybe because of the extreme use of the induction hob the Electrolux we put in when we renovated the kitchen gave up the ghost. I love my induction hob & can’t imagine ever cooking on anything else so I upgraded to a Bosch zoneless cooktop (meaning I can use the whole cooktop not just designated plates) with WiFi that connects to my phone and watch, which means they buzz when the timer goes off. Cute and handy!
We also got a new pool heater this summer, yes another one, they seem to last only five years , which if you do the math as I did, works out at “Are you freaking kidding me?” money per year.
Tuesday, September 20, 2016
Landscaping or revealing the Cool House
![]() |
| Yard after landscaping |
![]() |
| Front yard after landscaping |
I had my own issues with the landscaping but they were round the back. I'd never felt the bridge fitted in with the architecture of the house, and although we'd had it mended three times it was again in serious need of repair and I was ready to see it gone. I also hated the mess of a pool and collection of debris that ran along the dry bed that was supposed to be a gentle bubbling waterfall and stream. If the front yard was getting a facelift I was determined the back would have a boost, too.
![]() |
| Backyard after landscaping |
![]() |
| Yard before |
![]() |
| Yard awaiting demolition |
unique Andrew Geller architecture of the house. Remembering what it was like when we first viewed the house in 2003, when there were so many trees enclosing the house that we thought we had been misled by the realtor's flyer, it's a completely different reality. Now the house can shine in all its glory, for us and every passer-by to enjoy. This little video below encompasses how I feel now I can relax and kick back, reveling in this glorious Indian summer in the yard. Total and absolute bliss.
Sunday, June 12, 2016
Andrew Geller, Architect and Artist
Throughout the nineties Andrew Geller experimented with other forms of painting. He embraced pointillism both as pen and ink drawings and in large format acrylics and his work was often exhibited in local galleries. He continued to paint until a few months before his death in December 2011. One of my favorite Geller paintings is also one of his last: an abstracted dancing figure among swirls go red, purple and green, whimsical yet powerful.
Saturday, September 26, 2015
The upside
Saturday, September 19, 2015
Andrew Geller: Deconstructed at Nassau County Museum of Art
Friday, September 18, 2015
Loss
We are in mourning today for a part of the landscape, for what the tree surgeon described in April as the best tree in the Incorporated Village and for the core of our view every day for the past eleven years. When we moved in to the Cool House the previous owner explained the house's unusual design was conceived in part around this enormous mountain spruce tree in the front yard. Its beautiful fringed, dark green arms seemed to offer our home an enveloping hug, protecting it from the harsh Long Island winters, providing shade from the relentless summer sun. Each morning we have stood in front of the kitchen windows, sipping coffee, watching the birds and squirrels among the branches, marveling at its magnificence.
Tuesday, March 24, 2015
Andrew Geller: Deconstructed
As most readers of this blog know The Cool house was designed by iconic modernist architect Andrew Geller, best known for his geometric Long Island beach houses and design work for Raymond Loewy. Sadly Andrew Geller passed away in 2011 but he left behind a treasure trove of blueprints, photographs and documents that his grandson Jake Gorst has collated and preserved to ensure his grandfather's legacy.
From these sources and the interviews that he recorded over many years, Jake Gorst has lovingly produced a tribute to his grandfather. Andrew Geller: Deconstructed provides readers with a unique insight into the mind of an artist who over a fifty year career impacted the course of design and architecture. I received my copy yesterday and it is delightful, full of images never before published.
Jake is currently promoting the book at a series of events including a book signing on April 13 2015 at 7pm at the Book Revue in Huntington. Andrew Geller worked throughout the twentieth century mcm design revolution, his architecture can be found from Montauk to Texas and his commercial work took him from the restaurants on the 107th floor of the World Trade Center to Israel. I can't wait to get my copy signed and listen to Jake share personal anecdotes about "the architect of happiness". See you there?
Images from Andrew Geller: Deconstructed by Jake Gorst copyright © 2015, published by Glitterati Incorporated www.GlitteratiIncorporated.com
Monday, November 03, 2014
Spucing Up
Hard to believe that it's been almost a year since I last posted anything on this blog. It's not that we haven't been tending to The Cool House rather that social media has changed a lot about the way I document my life and that goes for the house too. I'm more likely to take a thousand word snap of something we've done and post it right there to Facebook or twitter. One click and I've saved all that tedious typing. You could say instagram killed this blog.
But it would be unfair to ask you to search through all the hundreds of photos of sunsets and kittens to find one that shows the renovated pool, or the color we ended up with in the sitting room after several, expensive redoes. So, here, in no particular order, are the projects we undertook in the first ten months of 2014.
Pool renovation: all the pipes, skimmers and reruns were replaced. This job entailed digging up and replacing half the brick patio but it mbas meant no more leaks. Also the pool light works again and we have a new, quieter energy saving pump. The pool housing is screened off with a nicer replacement for the termite eaten fence and next Spring a gas heater will be installed.
We lost a couple of trees and big rhododendrons to last year's severe winter, which Neal the Landscaper said was an opportunity, especially as the pool guys had to rip through the shrubbery to lay new pipes so hey presto one May weekend we got a new awesome shrubbery. well, almost new, The Guy insisted on keeping a dog wood because it looks spectacular from the master window for one week in May. It will probably come crashing down this winter!
The kitchen patio, front path and steps were re-grouted and broken bluestone slabs were replaced. We also installed four Marvin windows in the den, downstairs bath and basement where the rot or weather had damaged them beyond repair.
While all that was going on we started the BIG PAINT JOB, which kept getting bigger as we progressed form room to room. I'd taken three months to narrow down the fifty odd shades of gray and gold to half a dozen. We used Benjamin Moore Aura paint on all the walls and baseboards, which has no off gases and dries to a tough knock resist finish; the painters replaced moldings as needed. Eventually after much trial and error, we chose Collingwood for the kitchen and second and fourth bedrooms, Moonshine for the great room, stairs, hall and balcony and one bath, Camouflage for the third bedroom & the den. My office ended up Golden Tan, the third bedroom Buena Vista Gold, the laundry Metropolitan and we matched the original dusky pink tiles in the downstairs bath to Peau de Soie. The painters took advantage of the cool, dry summer and stained the house Mission Brown, with doors in Marvin Bronze to match the windows.
Last but certainly most significantly, we converted from oil to gas. This was prompted when our oil guy telling us he couldn't keep the monster burner going much longer coincided with an oil bill that cost more than our first new car. I won't bore you with the details of the 6 month saga of no heat or no hot water, repairs, work-arounds and crossing our fingers it took to get us to October 8 when National Grid finally turned the gas on. It's also not the prettiest project, and it took one guy an entire 8AM-4PM day to get the monster out of the basement but it did finally get done. We worried about an ugly gas meter outside our beautiful house but we managed to hide it behind an estate rhododendron. Can you see it in the photo above? No? Neither can anyone else! More importantly we can take showers without screaming and the air coming out of the vents is toasty so it's probably the project that impacts our comfort level the most.
10 years later
Finally, 10 years after we moved in, thirteen years after the last coat of Navajo white, we summoned up the courage to have the space painted. As this room is open to so many spaces, we envisioned chaos, with scaffolding everywhere and paint-splattered animals leaving tacky trails on the furniture and furnishings.
And the color? I had major issues here. The eastern light and huge windows played havoc with the hues. Each wall looked a different hue, a different color even. I'd love a color on one wall at 9 am and hate it by 1. Another would look great on one wall, be subtle on another and disappear on a third. It became a process of elimination and I know I drove the painters crazy, though they were much to polite to say so, even when I changed my mind in the middle of the night and emailed them with the new choice.
What do you know? Turns out the whole process was drama free. Even though some cats love the no-smell BM Aura paint and snuggled up to it at every opportunity, they managed to keep their paws out of the paint trays. Scaffolding? Not necessary. Three men with rollers accomplished the whole job in two days.
When it was all clean and fresh The Guy decided he had to have this bright and vibrant piece by Long Island artist Stanko, which was framed by rockstar framer Cherie Via Rexer of Ripe Art Gallery. It has a mid-century vibe that really sits well in the space. The only regret I have about this room is that we didn't have it painted four years ago when we renovated the kitchen. On the other had the paint color I had in mind for this room wouldn't have worked nearly as well and i would be repainting right about now...
Friday, December 20, 2013
Classic Miid-century Furniture Reissues
Great news for fans of classic American furniture by designer and manufacturer Harvey Probber. Until now his furniture has been out of production since the 80s, the only way to find his modular sofa has been the occasional sighting on ebay or 1stdibs. This Fall, M2L, a New York distributor of authorized modern furnishings catering to the design trade, has been licensed to produce new editions, including the 1947 Sling Chair above and the iconic 1972 Deep Tuft sectional below.
Prices for the Deep Tuft Sofa start at $15,000 in plush fabric for a 5 piece or $19,000 in leather. It may seem a lot but this furniture is so well made it will last a lifetime.
Here at The Cool House we inherited a 1968 12-piece sectional sofa that's still as comfortable and sturdy as ever-although it was reupholstered four years ago. As Probber once said "the true test of great design is time".
Other pieces to be reintroduced include sleek, wood wrapped casegoods and seating from the Architectural Series that were originally produced inFalls River MA in the 1960s.
Tuesday, June 11, 2013
Wet & Dry
As water from Tropical Storm Andrea poured down the road, swirled around the driveway, gushed past the newly planted hostas to fill the dell outside the dining room, we contemplated going with the flow by turning the dell into a giant pond; simply replacing the hostas with waterlilies. Which led me to remember I hadn't posted about a recent successful project in the backyard that turned the dank, smelly pond by the bridge into a dry water feature.
Firstly, a little background. For years I've been running interference with the dogs, trying to keep them from drinking out of the pond. We tried a cover but it was too cumbersome to move when we needed to get at the pump and mesh kept the dogs off but allowed decomposed leaves, garden debris and the balls off the damn linden tree to fall through the holes and fill the pond. Honestly, who would build a pond under a conifer and plant a bunch of fast-growing shrubs around it? I wanted the pond part gone but still needed a way to keep the water flowing to the rocks and along the stream.
I came across this low maintenance water feature on familyhandyman.com that looked perfect for our purposes. We already had most of the structure in place, it seemed easy-peasy to drain the pond and swap the mucky water for stone chips and gravel. The instructions indicated it could be completed within a couple of days so we began by buying six bags of pea gravel. These sat for a month on the patio while we dealt with a bunch of non-house related crises and some too wet/cold weekends
Finally, on Mothers' Day weekend in May when three consecutive days of sunshine were forecast The Guy set to scooping out the pond. He hauled six garden refuse bags of dirt out of there, at which point we knew those six bags of gravel were not going to make much of an impact. We used those bags as a base for the buckets that would act as miniature reservoirs and went back to Home Depot for another 10 bags of pea gravel. Two more trips to the HD later we were 18 bags in and almost to the top of the pond. We turned on the water and tested the pump and were suitably impressed when the heard water gurgling from the fountain. We still had a few damming issues along the stream (anther two bags of crap were filled) but in the end we had a dry water feature that works - it's a very quiet, soothing sound which adds to the ambience out back.
Saturday, June 08, 2013
Can I get a clean sweep?
Allow me a wee rant. I know I don't deserve such self indulgence because really, when was the last time I published a post? A month ago, two months? But I am verily pissed off, pushed to the edge and if I don't express the rage here I may let go in less appropriate quarters, and like blowing on a dandelion clock, you never know where the stuff ends up. No one wants to see that go down In Real Life.
Soooo, what, I hear you wonder, has got me so annoyed?
Not the wild flowers, certainly but the state of the roads. My road in particular. It is June, the second week in June to be precise, and our roads, that we pay a whole bunch of freaking money in property taxes to maintain, have yet to be swept.
And here's the excuse I heard at the Village Trustees meeting in May when I queried why the sweeper hadn't swept the sand and detritus from the winter:
"I know it's late this year but we need to be sure the last snowstorm has passed and we've had two lots of heavy rains before we can sweep."
Seriously, this was May 13th. The last snowstorm was early March and we've had weeks and weeks of rain since then. Also, no one had a definite date for road cleaning. According to the Village budget we have more money on hand than last year yet the budget for this fiscal year sets aside $2000 less for road seeping. Why? I'm quoting from memory here because the minutes haven't appeared online (SIGH) but the response was
"It was cheaper than we thought last year (a mild winter when it wasn't necessary to sweep the roads as much because little sand had been spread) and I didn't think we would need that amount of money this year."
So why aren't the roads being cleaned? The Incorporated Village could spend funds right now sweeping the sand, grit and other crap that I'm still treading through the house. More importantly it's a public safety issue. Cars and cyclists are skidding on the mess, a large portion of which has formed an island at the bottom of a steep hill. Every time it rains heavily that muck in the photo turns into sticky mud. When it's dry, it's like riding on marbles.
It's almost a month since the last Village meeting. Memorial Day has come and gone; we are officially into the summer season and still our roads are a disgusting, dangerous mess. The Town of Huntington, which maintains the southern end of the road had the sweepers out in April. It's ironic that our Village, incorporated to preserve its unique character, has worse roads than the town.































